
20 Rockwell Automation Publication 6000-IN006A-EN-P - April 2014
Chapter 1 Shipping and Handling Procedures
3. Align and secure the lifting angles in six places as shown in Figure 7 using
the hardware removed in step 2.
Figure 7 - Install Fasteners from the Lifting Angles to the Drive in six places
4. Install the supplied hardware (M12 bolt and nut, two flat washers) to join
the lifting angles together in three places (Figure 8
).
Figure 8 - Bolt vertical slots on the Lifting Angles in three places
Attach the Overhead Lifting Cables
1. Attach rigging assembly firmly to the lifting angles on the top of the Power
Module/LV Control Cabinet (Figure 9
).
Lifting Angle Pair
M20 x 60
Lockwasher
Washer
ATTENTION: The load carrying capacity of the lifting device and rigging must
be sufficient to safely raise the cabinet. Check the shipping weights by referring
to the container’s commercial invoice.
Komentarze do niniejszej Instrukcji