
Glossary of Fields Chapter 10
Rockwell Automation Publication RPTEXP-UM001H-EN-P-June 2014 175
Site
A level of the plant model (which is constructed by enterprise, site,
area, line, and then work cell).
Start Time
The date and time that the event or state started.
Start Value
The value collected at the start of the event.
State Count
The number of states that occurred during the reporting period.
State Name
The machine state. This field is color coded.
TEEP
(Total Effective Equipment Productivity (or Total Capacity).) A
Key Performance Indicator (KPI) that is similar to the OEE
calculation, but it uses Total Time instead of Available Time in the
calculation:
TEEP = (Good Parts * Ideal Cycle Time)/Total Time
TEEP = OEE*(Available Time/Total Time).
Throughput %
The performance of a machine when it is running compared to its
ideal cycle time. The ideal cycle time depends upon the product
Komentarze do niniejszej Instrukcji