Rockwell-automation AADvance Controller System Build Instrukcja Użytkownika Strona 73

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 130
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 72
Document: 553632
(ICSTT-RM448_EN_P) Issue: 08:
3-29
Install T9310 Expansion Cable
Install T9310 Expansion CableInstall T9310 Expansion Cable
Install T9310 Expansion Cable
1) The expansion cable ferrites are snap on components. Fit the ferrites 50mm (1.97)
from each end and secure with cable ties either side of the ferrites.
Connect Expansion Cable between T9100 Base Unit and T9300 I/O Base unit (IO Bus2)
Connect Expansion Cable between T9100 Base Unit and T9300 I/O Base unit (IO Bus2)Connect Expansion Cable between T9100 Base Unit and T9300 I/O Base unit (IO Bus2)
Connect Expansion Cable between T9100 Base Unit and T9300 I/O Base unit (IO Bus2)
1) Connect the expansion cable to a T9100 processor base unit for an IO Bus 2
connection.
Insert a cable socket assembly into the left hand connector of the T9100
processor base unit.
Przeglądanie stron 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 129 130

Komentarze do niniejszej Instrukcji

Brak uwag