
Rockwell Automation Publication 6000-IN007A-EN-P - October 2014 53
Commissioning Chapter 3
2. Open the Bypass cabinet door, and close QS2 and QS3.
Verify the Input and Output contactors are closed on the HMI.
3. Close the customer-supplied input circuit breaker by installing a
temporary jumper wire (X-117, X-119).
Verify the input circuit breaker is closed.
Komentarze do niniejszej Instrukcji